Construction work completed

It took long enough. But after the new office floor was finished at the beginning of September, it actually took a full three months to complete the new roof and the full thermal insulation on the external façade. During the remodelling, the latest gas condensing technology was also installed as heating and the existing solar collector system was enlarged.